This part is meant to fit specific bikes. Please select your bike to confirm that it will fit.

Bassani Road Rage 2-Into-1 Greg Lutzka Exhaust For Harley Dyna 1991-2017

$899.95


Add to Cart Qty

View more like this:

Bassani Road Rage Limited Edition Greg Lutzka 2-Into-1 Exhaust For Harley Dyna

The Bassani Road Rage pipes are known for 3 things. The unforgettable looks, the unmistakable sound and above all the unquestionable performance. The time-tested 2-into-1 equal-length headers are stepped from 1 3/4" to 1 7/8" and from there it utilizes an advanced inner collector for maximum performance. Only a limited number of these pipes will be made. 

Features:

  • Stainless steel construction and finish with exposed hand tig welds
  • Megaphone muffler with end cap and baffle included
  • 18mm O2 sensor ports and 12mm adapters
  • Includes hardware, poster, hat and stickers
  • Made in the USA

Note: Stainless steel pipes will naturally discolor.

This part is meant to fit specific bikes. Please select your bike to confirm that it will fit.

Fitment Notes & Exceptions
  • Fits 1991-Up FX Dyna models with mid-controls and 2007-Up FX Dyna models with forward controls only
    • Will not fit 1991-2006 Dyna models equipped with forward controls or 2012-Up FL Dyna models

This Product Fits:


Harley Davidson
Dyna Convertible FXDS 1994-2000
Dyna Fat Bob FXDF 2008-2017
Dyna Glide Daytona FXDB-D 1992
Dyna Glide Sturgis FXDB-S 1991
Dyna Low Rider FXDL/I 1993-2017
Dyna Low Rider S FXDLS 2016, 2017
Dyna Street Bob FXDB/I 2006-2017
Dyna Super Glide Custom FXDC/I 2005-2014
Dyna Super Glide FXD/I 1995-2010
Dyna Super Glide Sport FXDX 1999-2005
Dyna Super Glide Sport Touring FXDXT 2001, 2002, 2003
Dyna Wide Glide FXDWG/I 1993-2017
There are no reviews for this item. Write Review
Start typing your question and we'll check if it was already asked and answered. Learn More
No questions have been asked about this item. Be the first!
Product Style Item # Manufacturer Product # Availability
Stainless 1183905 18002135 Available: Requires 1-5 business days of lead time prior to shipment